Introduction
Compute consumption quantity/value as per BOM for Actual Production Quantity, Dispatch Quantity and IIRS Consumption.
Options
Options |
---|
Report Type - Actual Production Quantity, Dispatched Quantity, IIRS Consumption / Lead Time |
Date Range Validation - Invalid Date Range - Future Dates are not allowed - Gap between Date Range may not exceed 2 years |
Reports available under Consumption Of Material are listed below
Report |
---|
1. Actual Production Quantity - 1.1 Actual Production : This report will show the overall actual production quantity of various items. - 1.2. Output Wise Actual Consumption : This report shows the actual product output wise consumption. - 1.3. Input Wise Actual Consumption : It will show the actual consumption of items by input wise - 1.4. Input Wise Consumption Summary : This report will display the summary of items with consumption, rate and value |
2. Dispatched Quantity - 2.1. Output Wise Actual Consumption : It will show the actual consumption of items by output wise - 2.2. Input Wise Actual Consumption : It will show the actual consumption of items by input wise for dispatched items - 2.3. Input Wise Consumption Summary : This report will display the summary of items with consumption, rate and value. |
3. IIRS Consumption / Lead Time : - 3.1. IIRS Consumption LeadTime : This report will show the consumption of all Inventory Issues & Receipt Slips (IIRS) with qty, rate, lead time and other details. - 3.2. LeadTime : It will show the lead time with other details for various items |